Stockyard Grid Batt (21INR0492)

Stockyard Grid Batt is a 150.6 MW other interconnection project in Tarrant, Texas with a current status of operational. It is proposed to connect at 2082 Hicks 138kV .

150.6 MWCapacity
OperationalStatus
TarrantMarket
OtherTechnology

Project facts

Canonical nameStockyard Grid Batt
Queue ID21INR0492
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketTarrant
TechnologyOther
Capacity150.6 MW
StateTexas
CountyTarrant
Point of interconnection2082 Hicks 138kV
Requested (queue) date2020-01-13
Proposed in-service date
Operational date2028-12-14
Withdrawn date
DeveloperStockyard Grid, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.