Stone Church Wind (0313)

Stone Church Wind is a 150.0 MW wind interconnection project in St. Lawrence, New York with a current status of withdrawn. It is proposed to connect at Mc Intyre Substation 115 kV.

150.0 MWCapacity
WithdrawnStatus
EMarket
WindTechnology

Project facts

Canonical nameStone Church Wind
Queue ID0313
Statuswithdrawn
Source status0
MarketE
TechnologyWind
Capacity150.0 MW
StateNew York
CountySt. Lawrence
Point of interconnectionMc Intyre Substation 115 kV
Requested (queue) date2008-09-30
Proposed in-service date2011-03-31
Operational date
Withdrawn date
DeveloperAtlantic Wind, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata