Stoner Trail Storage (C24-332)

Stoner Trail Storage is a 100.0 MW battery interconnection project in Fulton, New York with a current status of withdrawn. It is proposed to connect at Inghams-Stoner 115kV line 9 and Meco-Maple Ave 115kV line 22.

100.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameStoner Trail Storage
Queue IDC24-332
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyFulton
Point of interconnectionInghams-Stoner 115kV line 9 and Meco-Maple Ave 115kV line 22
Requested (queue) date2024-10-09
Proposed in-service date
Operational date
Withdrawn date
DeveloperGranada Solar, LLC
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata