Stoney Brook 12kV (X1-034)

Stoney Brook 12kV is a 1.2 MW solar interconnection project in Morris, New Jersey with a current status of withdrawn.

1.2 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameStoney Brook 12kV
Queue IDX1-034
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity1.2 MW
StateNew Jersey
CountyMorris
Point of interconnection
Requested (queue) date2011-03-22
Proposed in-service date2014-12-21
Operational date
Withdrawn date2013-04-09
Developer
Utility / transmission ownerJCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata