Stowell (J3262)

Stowell is a 300.0 MW wind interconnection project in Jefferson, Texas with a current status of withdrawn. It is proposed to connect at Stowell.

300.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameStowell
Queue IDJ3262
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity300.0 MW
StateTexas
CountyJefferson
Point of interconnectionStowell
Requested (queue) date2024-04-12
Proposed in-service date2028-03-01
Operational date2028-03-01
Withdrawn date2025-12-23
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.