Straight Spur Wind (27INR0384)

Straight Spur Wind is a 247.4 MW other interconnection project in Andrews, Texas with a current status of operational. It is proposed to connect at Tap 345 kV 23876 Clear Fork -11157 Gardenale Switch .

247.4 MWCapacity
OperationalStatus
AndrewsMarket
OtherTechnology

Project facts

Canonical nameStraight Spur Wind
Queue ID27INR0384
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketAndrews
TechnologyOther
Capacity247.4 MW
StateTexas
CountyAndrews
Point of interconnectionTap 345 kV 23876 Clear Fork -11157 Gardenale Switch
Requested (queue) date2024-12-19
Proposed in-service date
Operational date2029-04-01
Withdrawn date
DeveloperENGIE IR Holdings LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata