Stuart-Clinton 345 kV III (AE1-031)

Stuart-Clinton 345 kV III is a 100.0 MW solar interconnection project in Montgomery, Ohio with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameStuart-Clinton 345 kV III
Queue IDAE1-031
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateOhio
CountyMontgomery
Point of interconnection
Requested (queue) date2018-06-04
Proposed in-service date2020-06-01
Operational date
Withdrawn date2018-06-29
Developer
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.