Stuart-Clinton 345kV (AC1-085)

Stuart-Clinton 345kV is a 400.0 MW solar interconnection project in Highland, Ohio with a current status of operational.

400.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameStuart-Clinton 345kV
Queue IDAC1-085
Statusoperational
Source statusIn Service
Market
TechnologySolar
Capacity400.0 MW
StateOhio
CountyHighland
Point of interconnection
Requested (queue) date2016-10-02
Proposed in-service date
Operational date2023-12-31
Withdrawn date
Developer
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.