Stuart Mesa Solar (54852)

Stuart Mesa Solar is a 56.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at 697 (Oceanside - San Luis Rey).

56.0 MWCapacity
WithdrawnStatus
CAISOMarket
SolarTechnology

Project facts

Canonical nameStuart Mesa Solar
Queue ID54852
Statuswithdrawn
Source statuswithdrawn
MarketCAISO
TechnologySolar
Capacity56.0 MW
StateCalifornia
County
Point of interconnection697 (Oceanside - San Luis Rey)
Requested (queue) date2023-04-17
Proposed in-service date2028-07-01
Operational date
Withdrawn date2024-12-02
Developer
Utility / transmission ownerSDGE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.