STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV (J3984)

STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV is a 200.0 MW solar interconnection project in Jefferson, Arkansas with a current status of withdrawn. It is proposed to connect at STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSTUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV
Queue IDJ3984
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateArkansas
CountyJefferson
Point of interconnectionSTUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV
Requested (queue) date2024-10-25
Proposed in-service date2030-09-02
Operational date2030-09-02
Withdrawn date2026-04-15
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata