Sugar Loaf Energy Storage II (C24-359)

Sugar Loaf Energy Storage II is a 300.0 MW battery interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at Sugarloaf 138 kV Substation.

300.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameSugar Loaf Energy Storage II
Queue IDC24-359
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity300.0 MW
StateNew York
CountyOrange
Point of interconnectionSugarloaf 138 kV Substation
Requested (queue) date2024-10-15
Proposed in-service date
Operational date
Withdrawn date
DeveloperHambletonian Energy Storage LLC
Utility / transmission ownerO&R

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata