Sugarberry Solar SLF is a 125.0 MW solar interconnection project in Kinney, Texas with a current status of operational. It is proposed to connect at 78255 Pinto Creek 138 kV.

125.0 MWCapacity
OperationalStatus
KinneyMarket
SolarTechnology

Project facts

Canonical nameSugarberry Solar SLF
Queue ID29INR0251
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketKinney
TechnologySolar
Capacity125.0 MW
StateTexas
CountyKinney
Point of interconnection78255 Pinto Creek 138 kV
Requested (queue) date2026-02-13
Proposed in-service date
Operational date2029-12-18
Withdrawn date
DeveloperEG Sugarberry LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata