Sugarloaf BESS (27INR0208)

Sugarloaf BESS is a 100.6 MW other interconnection project in Dimmit, Texas with a current status of operational. It is proposed to connect at (#80481) PILONCIL4 138KV.

100.6 MWCapacity
OperationalStatus
DimmitMarket
OtherTechnology

Project facts

Canonical nameSugarloaf BESS
Queue ID27INR0208
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketDimmit
TechnologyOther
Capacity100.6 MW
StateTexas
CountyDimmit
Point of interconnection(#80481) PILONCIL4 138KV
Requested (queue) date2024-03-22
Proposed in-service date
Operational date2028-01-31
Withdrawn date
DeveloperSugarloaf Clean Energy LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata