SUGARLOAF HYBRID SOLAR (1582)

SUGARLOAF HYBRID SOLAR is a 150.0 MW solar+battery interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at Panoche Substation 230kV.

150.0 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameSUGARLOAF HYBRID SOLAR
Queue ID1582
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity150.0 MW
StateCalifornia
CountyFresno
Point of interconnectionPanoche Substation 230kV
Requested (queue) date2019-04-15
Proposed in-service date
Operational date
Withdrawn date2020-03-09
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.