Sundown-Amaco-Yoakum 230 kV Substation (GEN-2024-015)

Sundown-Amaco-Yoakum 230 kV Substation is a 280.0 MW solar interconnection project in Yoakum, Texas with a current status of operational. It is proposed to connect at Sundown-Amaco-Yoakum 230 kV Substation.

280.0 MWCapacity
OperationalStatus
TXMarket
SolarTechnology

Project facts

Canonical nameSundown-Amaco-Yoakum 230 kV Substation
Queue IDGEN-2024-015
Statusoperational
Source statusDISIS STAGE
MarketTX
TechnologySolar
Capacity280.0 MW
StateTexas
CountyYoakum
Point of interconnectionSundown-Amaco-Yoakum 230 kV Substation
Requested (queue) date2024-10-04
Proposed in-service date
Operational date2028-09-01
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata