Sunnyside - Lawton Eastside 345kV (GEN-2009-036)

Sunnyside - Lawton Eastside 345kV is a 202.0 MW wind interconnection project in Murray, Oklahoma with a current status of withdrawn. It is proposed to connect at Sunnyside - Lawton Eastside 345kV.

202.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameSunnyside - Lawton Eastside 345kV
Queue IDGEN-2009-036
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity202.0 MW
StateOklahoma
CountyMurray
Point of interconnectionSunnyside - Lawton Eastside 345kV
Requested (queue) date2009-08-27
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.