Murray County, Oklahoma — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Murray, Oklahoma, representing 1,496 MW of requested capacity.

11Total projects
0Active
8Operational
3Withdrawn
1,496 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind81,132 MW
Battery1199 MW
Solar2165 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Sunnyside - Lawton Eastside 345kVGEN-2009-036Wind202.0 MWwithdrawnMurray, Oklahoma
Arbuckle 138 kV SubstationGEN-2024-164Battery199.0 MWwithdrawnMurray, Oklahoma
Arbuckle 138kV substationGEN-2016-126Wind172.5 MWoperationalMurray, Oklahoma
Chigley - Oaklawn 138 kV LineGEN-2024-219Solar160.0 MWoperationalMurray, Oklahoma
Arbuckle - Mill Creek 138 kV LineGEN-2024-390Wind150.0 MWwithdrawnMurray, Oklahoma
Origin Wind58938_WTWind150.0 MWoperationalMurray, Oklahoma
Rockhaven Wind Project, LLC64172_RHWWTWind140.0 MWoperationalMurray, Oklahoma
Glass Sands Wind Facility64750_1Wind117.0 MWoperationalMurray, Oklahoma
Arbuckle Mountain Wind Farm LLC59234_GEN1Wind100.0 MWoperationalMurray, Oklahoma
Tap Prices Falls - Carter 138kVGEN-2013-007Wind100.0 MWoperationalMurray, Oklahoma
Chickasaw Nation Solar Farm63500_CVS1Solar5.0 MWoperationalMurray, Oklahoma

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Murray County.

Start tracking with interXdata