Sunnyside to Gwynneville 345kV line (J2687)

Sunnyside to Gwynneville 345kV line is a 300.0 MW solar interconnection project in Hancock, Indiana with a current status of withdrawn. It is proposed to connect at Sunnyside to Gwynneville 345kV line.

300.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSunnyside to Gwynneville 345kV line
Queue IDJ2687
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity300.0 MW
StateIndiana
CountyHancock
Point of interconnectionSunnyside to Gwynneville 345kV line
Requested (queue) date2022-09-15
Proposed in-service date2026-09-30
Operational date2026-09-30
Withdrawn date2025-10-27
Developer
Utility / transmission ownerINDIANAPOLIS POWER & LIGHT COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata