SUNRISE BUTTE (1667)

SUNRISE BUTTE is a 150.0 MW solar+battery interconnection project in Imperial, California with a current status of active. It is proposed to connect at Imperial Valley Substation 230 kV.

150.0 MWCapacity
ActiveStatus
SDGEMarket
Solar+BatteryTechnology

Project facts

Canonical nameSUNRISE BUTTE
Queue ID1667
Statusactive
Source statusACTIVE
MarketSDGE
TechnologySolar+Battery
Capacity150.0 MW
StateCalifornia
CountyImperial
Point of interconnectionImperial Valley Substation 230 kV
Requested (queue) date2019-04-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata