Sunriver (L0296)

Sunriver is a 88.7 MW other interconnection project in Deschutes, Oregon with a current status of operational. It is proposed to connect at BPA LaPine-Pilot Butte 230kV Line.

88.7 MWCapacity
OperationalStatus
ORMarket
OtherTechnology

Project facts

Canonical nameSunriver
Queue IDL0296
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyOther
Capacity88.7 MW
StateOregon
CountyDeschutes
Point of interconnectionBPA LaPine-Pilot Butte 230kV Line
Requested (queue) date2008-04-18
Proposed in-service date
Operational date2012-09-01
Withdrawn date
DeveloperMidstate Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata