Sunriver (L0296)
Sunriver is a 88.7 MW other interconnection project in Deschutes, Oregon with a current status of operational. It is proposed to connect at BPA LaPine-Pilot Butte 230kV Line.
88.7 MWCapacity
OperationalStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | Sunriver |
|---|---|
| Queue ID | L0296 |
| Status | operational |
| Source status | ENERGIZED |
| Market | OR |
| Technology | Other |
| Capacity | 88.7 MW |
| State | Oregon |
| County | Deschutes |
| Point of interconnection | BPA LaPine-Pilot Butte 230kV Line |
| Requested (queue) date | 2008-04-18 |
| Proposed in-service date | — |
| Operational date | 2012-09-01 |
| Withdrawn date | — |
| Developer | Midstate Electric Cooperative, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata