Sunrose Renewable Energy Solar SLF (28INR0061)

Sunrose Renewable Energy Solar SLF is a 309.9 MW solar interconnection project in Austin, Texas with a current status of operational. It is proposed to connect at Tap 138kV #44740 WALLIS - #44700 GEBHRT .

309.9 MWCapacity
OperationalStatus
AustinMarket
SolarTechnology

Project facts

Canonical nameSunrose Renewable Energy Solar SLF
Queue ID28INR0061
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketAustin
TechnologySolar
Capacity309.9 MW
StateTexas
CountyAustin
Point of interconnectionTap 138kV #44740 WALLIS - #44700 GEBHRT
Requested (queue) date2024-04-09
Proposed in-service date
Operational date2029-12-31
Withdrawn date
DeveloperSunrose Renewable Energy LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata