SUNSETTER BESS (23INR0205)

SUNSETTER BESS is a 100.0 MW other interconnection project in Uvalde, Texas with a current status of operational. It is proposed to connect at 5885 Downie 138kV.

100.0 MWCapacity
OperationalStatus
UvaldeMarket
OtherTechnology

Project facts

Canonical nameSUNSETTER BESS
Queue ID23INR0205
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketUvalde
TechnologyOther
Capacity100.0 MW
StateTexas
CountyUvalde
Point of interconnection5885 Downie 138kV
Requested (queue) date2021-02-09
Proposed in-service date
Operational date2027-11-30
Withdrawn date
DeveloperCED Development Inc
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.