SunShiner ESS (26INR0179)

SunShiner ESS is a 200.0 MW other interconnection project in Zavala, Texas with a current status of operational. It is proposed to connect at 8672 LaPryor2A 138 kV.

200.0 MWCapacity
OperationalStatus
ZavalaMarket
OtherTechnology

Project facts

Canonical nameSunShiner ESS
Queue ID26INR0179
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketZavala
TechnologyOther
Capacity200.0 MW
StateTexas
CountyZavala
Point of interconnection8672 LaPryor2A 138 kV
Requested (queue) date2023-09-25
Proposed in-service date
Operational date2029-05-11
Withdrawn date
DeveloperSunShiner ESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata