Sunwine Solar (1224)

Sunwine Solar is a 50.0 MW other interconnection project in Westfield, New York with a current status of withdrawn. It is proposed to connect at Westfield Electric 115kV .

50.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameSunwine Solar
Queue ID1224
Statuswithdrawn
Source status0
Market
TechnologyOther
Capacity50.0 MW
StateNew York
CountyWestfield
Point of interconnectionWestfield Electric 115kV
Requested (queue) date2021-07-28
Proposed in-service date2021-10-31
Operational date
Withdrawn date
DeveloperNorthland Power U.S. Projects
Utility / transmission ownerNYISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata