Supra Wind (27INR0063)

Supra Wind is a 205.9 MW other interconnection project in Hardeman, Texas with a current status of operational. It is proposed to connect at Tap #6101 Riley 7A to #60505 Edithcla 7B 345kV .

205.9 MWCapacity
OperationalStatus
HardemanMarket
OtherTechnology

Project facts

Canonical nameSupra Wind
Queue ID27INR0063
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHardeman
TechnologyOther
Capacity205.9 MW
StateTexas
CountyHardeman
Point of interconnectionTap #6101 Riley 7A to #60505 Edithcla 7B 345kV
Requested (queue) date2023-07-10
Proposed in-service date
Operational date2027-12-23
Withdrawn date
DeveloperNextera
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata