SUTTER ENERGY CENTER 2 (569)

SUTTER ENERGY CENTER 2 is a 600.0 MW gas interconnection project in Sutter, California with a current status of withdrawn. It is proposed to connect at Table Mountain-Tesla 500kV.

600.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameSUTTER ENERGY CENTER 2
Queue ID569
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologyGas
Capacity600.0 MW
StateCalifornia
CountySutter
Point of interconnectionTable Mountain-Tesla 500kV
Requested (queue) date2010-02-01
Proposed in-service date—
Operational date—
Withdrawn date2014-01-22
Developer—
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.