SUTTER ENERGY CENTER (379)

SUTTER ENERGY CENTER is a 600.0 MW gas interconnection project in Sutter, California with a current status of withdrawn. It is proposed to connect at Table Mountain-Tesla 500kV line .

600.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameSUTTER ENERGY CENTER
Queue ID379
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity600.0 MW
StateCalifornia
CountySutter
Point of interconnectionTable Mountain-Tesla 500kV line
Requested (queue) date2008-05-28
Proposed in-service date
Operational date
Withdrawn date2010-12-07
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata