SW Minot (GEN-2025-GR3)

SW Minot is a 4.9 MW wind interconnection project in Max, North Dakota with a current status of active. It is proposed to connect at SW Minot.

4.9 MWCapacity
ActiveStatus
NDMarket
WindTechnology

Project facts

Canonical nameSW Minot
Queue IDGEN-2025-GR3
Statusactive
Source statusSPECIAL STUDY
MarketND
TechnologyWind
Capacity4.9 MW
StateNorth Dakota
CountyMax
Point of interconnectionSW Minot
Requested (queue) date2025-10-06
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata