Sweet Valley Solar (C24-195)

Sweet Valley Solar is a 100.0 MW solar interconnection project in Genesee, New York with a current status of withdrawn. It is proposed to connect at Dysinger - Station 255 345kV, line #1.

100.0 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameSweet Valley Solar
Queue IDC24-195
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity100.0 MW
StateNew York
CountyGenesee
Point of interconnectionDysinger - Station 255 345kV, line #1
Requested (queue) date2024-09-19
Proposed in-service date
Operational date
Withdrawn date
DeveloperSweet Valley Energy Center
Utility / transmission ownerNYPA

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.