Sweetwater 2 repower (17INR0068)

Sweetwater 2 repower is a 7.3 MW other interconnection project in Nolan, Texas with a current status of operational. It is proposed to connect at 71050 Bitter Creek 345kV.

7.3 MWCapacity
OperationalStatus
NolanMarket
OtherTechnology

Project facts

Canonical nameSweetwater 2 repower
Queue ID17INR0068
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketNolan
TechnologyOther
Capacity7.3 MW
StateTexas
CountyNolan
Point of interconnection71050 Bitter Creek 345kV
Requested (queue) date2017-10-05
Proposed in-service date
Operational date2024-11-30
Withdrawn date
DeveloperLeeward Renewable Energy Development, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.