Sweetwater 230kV substation (GEN-2019-066)
Sweetwater 230kV substation is a 50.0 MW battery interconnection project in Beckham, Oklahoma with a current status of withdrawn. It is proposed to connect at Sweetwater 230kV substation.
50.0 MWCapacity
WithdrawnStatus
OKMarket
BatteryTechnology
Project facts
| Canonical name | Sweetwater 230kV substation |
|---|---|
| Queue ID | GEN-2019-066 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OK |
| Technology | Battery |
| Capacity | 50.0 MW |
| State | Oklahoma |
| County | Beckham |
| Point of interconnection | Sweetwater 230kV substation |
| Requested (queue) date | 2019-05-24 |
| Proposed in-service date | 2026-05-01 |
| Operational date | — |
| Withdrawn date | 2023-06-21 |
| Developer | — |
| Utility / transmission owner | AEP |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata