Sweetwater 4 Repower (29INR0325)

Sweetwater 4 Repower is a 421.2 MW other interconnection project in Nolan, Texas with a current status of active. It is proposed to connect at <71050> <L_BITTCR5_1Y> <345kV>.

421.2 MWCapacity
ActiveStatus
NolanMarket
OtherTechnology

Project facts

Canonical nameSweetwater 4 Repower
Queue ID29INR0325
Statusactive
Source statusSS Started, FIS Started, No IA
MarketNolan
TechnologyOther
Capacity421.2 MW
StateTexas
CountyNolan
Point of interconnection<71050> <L_BITTCR5_1Y> <345kV>
Requested (queue) date2026-04-22
Proposed in-service date2029-02-01
Operational date
Withdrawn date
DeveloperSweetwater Wind 3 LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.