SWEPCO Midway No. 832 12.5 kV Substation (ASGI-2024-022)
SWEPCO Midway No. 832 12.5 kV Substation is a 32.7 MW gas interconnection project in Caddo, Louisiana with a current status of withdrawn. It is proposed to connect at SWEPCO Midway No. 832 12.5 kV Substation.
32.7 MWCapacity
WithdrawnStatus
LAMarket
GasTechnology
Project facts
| Canonical name | SWEPCO Midway No. 832 12.5 kV Substation |
|---|---|
| Queue ID | ASGI-2024-022 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | LA |
| Technology | Gas |
| Capacity | 32.7 MW |
| State | Louisiana |
| County | Caddo |
| Point of interconnection | SWEPCO Midway No. 832 12.5 kV Substation |
| Requested (queue) date | 2025-03-01 |
| Proposed in-service date | 2027-04-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AEP |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-20 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata