Swift Air Solar II (68587_OSAS2)

Swift Air Solar II is a 173.6 MW solar interconnection project in Ector, Texas with a current status of operational.

173.6 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameSwift Air Solar II
Queue ID68587_OSAS2
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity173.6 MW
StateTexas
CountyEctor
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-11-01
Withdrawn date—
Developer—
Utility / transmission ownerOrigis Energy USA, Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02capacity_mw100.0173.6high
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.