Swifton - Hoxie South 161 kV Line Tap (J1137)

Swifton - Hoxie South 161 kV Line Tap is a 100.0 MW solar interconnection project in Jackson County, Arkansas with a current status of withdrawn. It is proposed to connect at Swifton - Hoxie South 161 kV Line Tap.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSwifton - Hoxie South 161 kV Line Tap
Queue IDJ1137
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateArkansas
CountyJackson County
Point of interconnectionSwifton - Hoxie South 161 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2021-09-30
Operational date2021-09-30
Withdrawn date2019-08-28
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata