Swire Coca-Cola Draper (70112_11794)

Swire Coca-Cola Draper is a 3.7 MW solar interconnection project in Salt Lake, Utah with a current status of operational.

3.7 MWCapacity
OperationalStatus
PACEMarket
SolarTechnology

Project facts

Canonical nameSwire Coca-Cola Draper
Queue ID70112_11794
Statusoperational
Source status(OP) Operating
MarketPACE
TechnologySolar
Capacity3.7 MW
StateUtah
CountySalt Lake
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2026-01-01
Withdrawn date
Developer
Utility / transmission ownerSwire Coca-Cola

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.