swoose BESS III is a 103.8 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at tnpyote bus number 38001.

103.8 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameswoose BESS III
Queue ID26INR0642
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity103.8 MW
State
County
Point of interconnectiontnpyote bus number 38001
Requested (queue) date2025-01-13
Proposed in-service date2026-07-01
Operational date
Withdrawn date
DeveloperTempus Power management LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.