Swoose I (64916_SWOO1)

Swoose I is a 9.9 MW battery interconnection project in Ward, Texas with a current status of operational.

9.9 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameSwoose I
Queue ID64916_SWOO1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity9.9 MW
StateTexas
CountyWard
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-07-01
Withdrawn date—
Developer—
Utility / transmission ownerSwoose II

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata