Symank Solar (27INR0298)

Symank Solar is a 66.5 MW solar interconnection project in Bosque, Texas with a current status of operational. It is proposed to connect at Tap 69 kV 37470 TNOLSEN - 37520 TNSYCAMORE.

66.5 MWCapacity
OperationalStatus
BosqueMarket
SolarTechnology

Project facts

Canonical nameSymank Solar
Queue ID27INR0298
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBosque
TechnologySolar
Capacity66.5 MW
StateTexas
CountyBosque
Point of interconnectionTap 69 kV 37470 TNOLSEN - 37520 TNSYCAMORE
Requested (queue) date2024-11-19
Proposed in-service date
Operational date2027-12-15
Withdrawn date
DeveloperBT Symank Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata