Syncarpha Blandford Solar plus battery storage (1063)
Syncarpha Blandford Solar plus battery storage is a 5.0 MW solar+battery interconnection project in Berkshire, Massachusetts with a current status of operational. It is proposed to connect at Eversource 23 kv 19J2.
5.0 MWCapacity
OperationalStatus
WMAMarket
Solar+BatteryTechnology
Project facts
| Canonical name | Syncarpha Blandford Solar plus battery storage |
|---|---|
| Queue ID | 1063 |
| Status | operational |
| Source status | C |
| Market | WMA |
| Technology | Solar+Battery |
| Capacity | 5.0 MW |
| State | Massachusetts |
| County | Berkshire |
| Point of interconnection | Eversource 23 kv 19J2 |
| Requested (queue) date | 2020-09-15 |
| Proposed in-service date | — |
| Operational date | 2021-12-14 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.