Syncarpha Puddon II Hybrid CSG (62970_SYP2B)

Syncarpha Puddon II Hybrid CSG is a 4.0 MW battery interconnection project in Worcester, Massachusetts with a current status of operational.

4.0 MWCapacity
OperationalStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical nameSyncarpha Puddon II Hybrid CSG
Queue ID62970_SYP2B
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyBattery
Capacity4.0 MW
StateMassachusetts
CountyWorcester
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2021-03-01
Withdrawn date
Developer
Utility / transmission ownerSyncarpha Puddon II, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata