T Corners 115kV Sub (J1866)

T Corners 115kV Sub is a 125.0 MW wind interconnection project in Clark, Wisconsin with a current status of withdrawn. It is proposed to connect at T Corners 115kV Sub.

125.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameT Corners 115kV Sub
Queue IDJ1866
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity125.0 MW
StateWisconsin
CountyClark
Point of interconnectionT Corners 115kV Sub
Requested (queue) date2021-08-16
Proposed in-service date2024-09-15
Operational date2024-09-15
Withdrawn date2023-10-09
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.