t . (027050)
t . is a 575.0 MW gas interconnection project in Pasco, Florida with a current status of active. It is proposed to connect at Hudson N Substation.
575.0 MWCapacity
ActiveStatus
FLMarket
GasTechnology
Project facts
| Canonical name | t . |
|---|---|
| Queue ID | 027050 |
| Status | active |
| Source status | — |
| Market | FL |
| Technology | Gas |
| Capacity | 575.0 MW |
| State | Florida |
| County | Pasco |
| Point of interconnection | Hudson N Substation |
| Requested (queue) date | 2015-11-10 |
| Proposed in-service date | 2020-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | T and M Solar |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata