TAIN SOLAR (22INR0473)

TAIN SOLAR is a 37.5 MW solar interconnection project in Caldwell, Texas with a current status of operational. It is proposed to connect at tap 138kV 7216 Lockhart - 7224 Luling City.

37.5 MWCapacity
OperationalStatus
CaldwellMarket
SolarTechnology

Project facts

Canonical nameTAIN SOLAR
Queue ID22INR0473
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCaldwell
TechnologySolar
Capacity37.5 MW
StateTexas
CountyCaldwell
Point of interconnectiontap 138kV 7216 Lockhart - 7224 Luling City
Requested (queue) date2020-12-03
Proposed in-service date
Operational date2027-10-27
Withdrawn date
DeveloperABEI ENERGY&INFRASTRUCTURE LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata