Tanglewood Solar (23INR0054)

Tanglewood Solar is a 251.0 MW solar interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at 345kV Seabreeze Substation.

251.0 MWCapacity
OperationalStatus
BrazoriaMarket
SolarTechnology

Project facts

Canonical nameTanglewood Solar
Queue ID23INR0054
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketBrazoria
TechnologySolar
Capacity251.0 MW
StateTexas
CountyBrazoria
Point of interconnection345kV Seabreeze Substation
Requested (queue) date2020-07-10
Proposed in-service date
Operational date2026-06-30
Withdrawn date
DeveloperBrazoria West Solar Project, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata