tap 115 kV line betwwen W Arkadelphia sub and Delarc sub at 3.85 miles from West Arkadelphia substat (J508)

tap 115 kV line betwwen W Arkadelphia sub and Delarc sub at 3.85 miles from West Arkadelphia substat is a 42.7 MW gas interconnection project in Clark County, Arkansas with a current status of withdrawn. It is proposed to connect at tap 115 kV line betwwen W Arkadelphia sub and Delarc sub at 3.85 miles from West Arkadelphia substat.

42.7 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nametap 115 kV line betwwen W Arkadelphia sub and Delarc sub at 3.85 miles from West Arkadelphia substat
Queue IDJ508
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity42.7 MW
StateArkansas
CountyClark County
Point of interconnectiontap 115 kV line betwwen W Arkadelphia sub and Delarc sub at 3.85 miles from West Arkadelphia substat
Requested (queue) date2015-11-16
Proposed in-service date2017-04-01
Operational date2017-04-01
Withdrawn date2017-07-17
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata