Tap 345 kV line between Lamar and Finney (GEN-2021-046)

Tap 345 kV line between Lamar and Finney is a 400.0 MW wind interconnection project in Prowers, Kiowa, Colorado with a current status of withdrawn. It is proposed to connect at Tap 345 kV line between Lamar and Finney.

400.0 MWCapacity
WithdrawnStatus
COMarket
WindTechnology

Project facts

Canonical nameTap 345 kV line between Lamar and Finney
Queue IDGEN-2021-046
Statuswithdrawn
Source statusWITHDRAWN
MarketCO
TechnologyWind
Capacity400.0 MW
StateColorado
CountyProwers, Kiowa
Point of interconnectionTap 345 kV line between Lamar and Finney
Requested (queue) date2021-04-28
Proposed in-service date2026-12-31
Operational date
Withdrawn date2022-11-10
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.