Tap Border - TUCO Interchange 345kV (GEN-2012-038)

Tap Border - TUCO Interchange 345kV is a 203.0 MW other interconnection project in Floyd, Texas with a current status of withdrawn. It is proposed to connect at Tap Border - TUCO Interchange 345kV.

203.0 MWCapacity
WithdrawnStatus
TXMarket
OtherTechnology

Project facts

Canonical nameTap Border - TUCO Interchange 345kV
Queue IDGEN-2012-038
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyOther
Capacity203.0 MW
StateTexas
CountyFloyd
Point of interconnectionTap Border - TUCO Interchange 345kV
Requested (queue) date2012-09-30
Proposed in-service date
Operational date
Withdrawn date2013-05-24
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata