Tap Cochran - Lehman 115kV substation (GEN-2015-014)

Tap Cochran - Lehman 115kV substation is a 150.0 MW wind interconnection project in Cochran County, Texas with a current status of operational. It is proposed to connect at Tap Cochran - Lehman 115kV substation.

150.0 MWCapacity
OperationalStatus
TXMarket
WindTechnology

Project facts

Canonical nameTap Cochran - Lehman 115kV substation
Queue IDGEN-2015-014
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketTX
TechnologyWind
Capacity150.0 MW
StateTexas
CountyCochran County
Point of interconnectionTap Cochran - Lehman 115kV substation
Requested (queue) date2015-03-31
Proposed in-service date
Operational date2016-12-01
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.