Tap Cochran to Lehman 115 kV Line (GEN-2023-SR12)

Tap Cochran to Lehman 115 kV Line is a 120.0 MW battery interconnection project in Whiteface, Texas with a current status of active. It is proposed to connect at Tap Cochran to Lehman 115 kV Line.

120.0 MWCapacity
ActiveStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameTap Cochran to Lehman 115 kV Line
Queue IDGEN-2023-SR12
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketTX
TechnologyBattery
Capacity120.0 MW
StateTexas
CountyWhiteface
Point of interconnectionTap Cochran to Lehman 115 kV Line
Requested (queue) date2023-02-13
Proposed in-service date2025-09-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerXcel/SPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.